About:
|
When a stack is burnt out as well as we pour the concrete before the augers are extracted it is described as a CFA pile or SFA stack. Screw heaps come in areas, the very first section which is installed has the cutting blade. If the wanted deepness as well as consequently load bearing ability has actually not been reached, succeeding sizes are after that made use of.
|