|
About:
|
When a stack is burnt out and also we pour the concrete before the augers are removed it is described as a CFA pile or SFA stack. Screw stacks come in sections, the first area which is installed has the cutting blade. If the preferred deepness and also for that reason load bearing ability has not been gotten to, succeeding sizes are after that used.
|